Saturday, September 22, 2012

For the Record - Spring Commissioning Punchlist

With winter storage nearly upon us, I need to do some blog housekeeping. Below is posted "for the record" the spring commissioning tasks I neglected to post last May. I post them now for reference next spring, and to "reverse engineer" winter storage prep. For a more detailed treatment of winter storage preparation steps, see my September 10, 2011, post.


Tasks                                                                               Completion
Remove /clean/store protective tarp.                                    5/16
Disconnect shore power.                                                     5/13
Check diesel engine while on hard.                                      5/14                              
Connect fresh water system plumbing/flush.                         5/16
Install running rigging                                                           5/18
Hank on sails                                                                      5/18
Hook up Furuno - load new charts                                     5/17
End for end anchor rode,  fit anchor.                                  5/18
Top off battery water.                                                       5/20
Install knot meter.                                                             5/18
Supervise sat phone installation.                                         5/18
Test sat phone - get GRIB.                                                5/22
Test SSB, get GRIB.                                                         5/22
Double check through hulls.                                               5/25
Test EPIRB, PLB.                                                            5/22
Assemble anchor, test windlass.                                        5/18
Test instruments - wind, depth, speed, AIS.                      5/19
Assemble headsail furler                                                    5/18                
Prep fresh water system                                                    5/16
Install nav lights, check                                                     5/16
Hank on staysail, check, prep sheets.                               5/20                       
Rig inspection (Harry Lewis).                                           5/22
Check tricolor light, engine running light                            5/19
Check deck light.                                                             5/21
Replace anchor light bulb; check.                                      5/22
Buy outboard gasoline.                                                     5/18
Check outboard oil, etc.                                                   5/27
Go to ATM                                                                       5/24
Develop crossing menu & provisioning list.                        5/22
Polish stainless.                                                                 5/26
Prepare food for crossing.                                                 5/23
Clean, wax and polish deck.                                             5/24
Set up jack lines.                                                               5/21
Assemble running back rigging                                           5/21
Mount lifesling.                                                                  5/20
Mount life buoy.                                                                5/17
Mount Danbuoy .                                                               5/25
Get stanchion fixed                                                            5/21
Check ditch bag                                                                5/24
Check Garmin GPS unit.                                                   5/21
Check handheld VHF radios.                                            5/24
Clean cabin/head.                                                              5/26
Make up berths, including lee cloths.                                  5/26
Update Ship's Papers.                                                        5/25
Inspect/Repack PFDs.                                                       5/24
Set up drogue - attach chain.                                             5/21         
Check deviation card.                                                        5/28
Check that flashlights and spotlight work                            5/25
Wire anchor shackle shut.                                                5/21
Find and put out second winch handle.                              5/25
Top off engine oil.                                                            5/25
Mount bowsprit.                                                               5/21
Mount gennaker sheet & tack line blocks.                         5/21
Download Realtek update to Lenovo, check.                    5/25
Clean and organize lazarette/cockpit locker.                     5/22